Oil & gas operators · From built
to operating.

Where capital is stuck and what holds up each handover.

Agile teams work faster with Sytex

Knight PiésoldContriniGrúas Martín
What Sytex solves

What you cannot see today, and how it comes into view.

For managementProgress dashboard by system

Progress per system is put together by hand for management.

  • Precom and com progress per system
  • A and B punch items per contractor
  • Built from the signed sheets

Every signed sheet moves the system’s progress on management’s board.

A punch items show up on handover day.

Each punch item is logged as A or B as soon as it appears; A items sit on the system they hold up.

The evidence is not enough to close the punch item.

On upload, evidence is checked against the procedure; if it falls short, new evidence is requested in the field.

Each contractor uses its own sheet format.

Your procedure is loaded once as a sheet, and every contractor fills it in the same way.

Precommissioning sheets arrive on paper.

The contractor fills in and signs the sheet on the phone, and management sees it once it syncs.

The system’s material is not there when assembly starts.

Each system’s material list flags what will arrive after assembly starts.

With Sytex

The dashboard management checks every Monday.

Critical itemsPunch list
ItemSystemContractorDays openPriority
Valve without TAGSIS-01Montajes Norte9 dA
Missing support on 2" lineSIS-01Montajes Norte6 dA
Hydrostatic test failedSIS-04Obras del Valle4 dA
Incomplete insulationSIS-05Servicios Andinos2 dA
14 A items across 3 projects · 5 open for more than a week
What holds the handover · SIS-01PAD-12
Sheets signed46 / 52
Tests approved7 / 9
A items open3
Valve without TAG
Missing support on 2" line
Leak on the inlet line
Planned02 nov
→
Likely14 nov
ContractorsPAD-12
ContractorOpen itemsAvg. days to closeTrend
Montajes Norte124,1 d−0,6 d
Obras del Valle96,8 d+1,2 d
Servicios Andinos52,3 d−0,9 d
From what each one loads in the field.
Coming handoversPAD-12
SystemPlannedLikelyStatus
SIS-02 Produced water18 oct18 octHanded over
SIS-01 Gas separation02 nov14 novLate
SIS-04 Gas venting06 nov06 novOn time
SIS-07 Crude inlet20 nov20 novOn time
Risk

Critical issues first.

Every project’s A items in one list, with their system, contractor and days open.

Handovers

What each system still needs to be handed over.

Unsigned sheets, pending tests and A items, system by system, without asking for a report.

Contractors

How each contractor responds.

Open items and average days to close per contractor, from what they load in the field themselves.

Plan

The handovers of the coming weeks.

Planned against likely date for every system, to decide this week where to put resources.

Behind the dashboard

Every number on the dashboard comes from a signature in the field.

  1. Engineering loads the systemsFrom the list, with their TAGs
  2. The contractor signs in the fieldIn the app, even with no signal
  3. AI reviews the sheetIt flags what does not comply
  4. The punch list tracks the itemsAn A item holds the handover
  5. The certificate is issuedAnd the system goes to operations
Built around your procedure

It is set up with your procedure, and changes when it changes.

Your sheets and your stages

Sheets, stages and the certificate are configured with what your team already uses, per client and per contract.

Your contractors, inside your project

Each one reports in your project with its own scope, and management sees them all on one dashboard.

Changes without a development project

When the procedure changes, your team edits the sheet or the stage and the next job already uses it.

Platform figures

What already runs on Sytex.

These are platform-wide numbers, across every industry we work in.

Locations managed

385,000

Sites, wells, plants and segments of network.

Field activities a day

18,000

Each one closed with its evidence.

Countries

9

Across Latin America.

Questions we get

Does it work where there is no signal?

Yes. The field app keeps sheets, photos and signatures offline and uploads them when the signal comes back. The dashboard updates at that moment.

Do we have to change our procedure?

No. Your sheets, your stages and your handover certificate are configured. If the procedure changes, your team edits it.

What about what is on paper today?

The list of systems, subsystems and TAGs is loaded from Excel, and sheets already signed on paper are attached to their system. From there, new work is logged in the field.

Does Sytex certify regulatory compliance?

No. Sytex runs the procedure you define and keeps the evidence of how it was executed, with its dates, its photos and its signatures. The certification is yours; what Sytex gives you is the record to answer an audit with.

Getting started

Start with one system.

Bring a project's system list and one pre-commissioning sheet, and we walk through it with your stages.

You talk to Alfred, our AI assistant, and then to the team.