We will be at Futurecom 2026 · Oct 6-8 · São Paulo Expo Book 20 minutes with us →
Network operators

Your rollout plan, up to date.

Progress updates when the work closes on site, not when someone consolidates a spreadsheet.

Rollout planTasksSites
Rollout plan5G · phase 2 · 4 fronts
5G rollout · phase 2Status: openAll contractors
Search
Sites in progress38
Under review12
Closed this month84
Avg. days to service11
Progress per stage60 sites
Civil works and infrastructure70%
BR-SP · 42/60
Antenna installation52%
BR-RJ · 31/60
Commissioning28%
BR-MG · 17/60
Acceptance inspection15%
BR-SP · 9/60

Agile teams work faster with Sytex

Deutsche TelekomBrisanetIHS TowersTelefónicaClaroOFGVivo
The chain

One order, and it closes without anyone pushing it.

Implantação BR-SP-04412PR-26-0418
5G rollout · phase 2120 dIn progress
Site BR-SP-04412 · sector antenna31 dIn progress
Site survey1 dCompleted
Engineering2 dCompleted
Civil works and infrastructure4 dIn progress
Antenna installation8 dOpen
Acceptance inspection2 dOpen
Antenna installationTA-26-802511
TaskTA-26-802511Open
InformationSiteFilesMaterials
SiteBR-SP-04412 · Vila PrudenteRooftop · access with a key from the building manager-23.5891, -46.5804Last visit 14 Aug
Network elements6 installed on this siteTower 48 mRRU ×3Antenna 2100 ×31 pending
Material operationMP-26-0418What the crew installs comes off this operation, and the stock moves when the task closes.Antenna 2100 ×3RRU ×3Received on site

Everything the crew needs to know about the site travels on the task. Nobody has to call the office to find out what is up there.

TasksTA · 214
Zopone · team 7Civil works
Search
Open21
TA-26-802511Antenna installation
Zopone · team 7BR-SP-04412
8 dP1
TA-26-802514Grounding and surge protection
Zopone · team 7BR-SP-04412
2 dP2
In progress12
TA-26-802509Civil works and infrastructure
Zopone · team 7BR-SP-04412
4 dP1
To review1
TA-26-802502Site survey
Zopone · team 4BR-SP-04412
1 dP2
Installation reportFO-26-174231
FO-26-174231Submitted
Antenna installation reportBR-SP-04412 · Vila Prudente · TA-26-802511
Mounting
Antenna serial numberHW-AAU5613-2291
Azimuth measured128°
Mechanical tilt
Height on the tower42 m
Evidence
Antenna front on the pole
Front
Antenna mounts on the tower
Mounts
The tower from the base
Tower top
Material used
Antenna 21003
RRU3
Jumper 1/2"12 m
Closure
TechnicianLucas Prado
Closed on site12 Sep · 18:04
Captured offline · it syncs when the phone gets signal back
Planning

The work comes out of the plan.

Not out of an email. The stage of the project opens the work it needs, with the site and the scope already on it.

Dispatch

The work order carries the site with it.

What was built there, what is installed, what the last visit found. The crew does not have to call the office to find out.

Contractor · team 7

Your crews and your contractors, in the same queue.

Each one sees their own work, with their own permissions, and reports in the form you defined, not in the one they use for another customer.

Technician

The field reports with no signal.

Photos, serial numbers, measurements and signatures, captured offline on the site and synced when the phone gets the signal back.

Scheduling agent

The agent assigns. Your team approves.

You build them: each one has its role, its trigger and what it may do.

Completed
Project start and WBSPM
1d
Scheduling and contractor assignment
4d Scheduling agent
Permits validation
10d
Site preparation
1d
Initial walkthrough
1d
Implantação BR-SP-04412 TA-26-802510
TaskTA-26-802510OpenIn progress

Scheduling and contractor assignment

InformationActivitiesFilesDiscussion (1)
EF158HHImplantação BR-SP-04412

Indicate the contractor for this project, and the deadline for finishing it.

Activities
Assign contractor…Zopone · team 7
Scheduling agent · contractor assigned and deadline set inside the project window
Scheduling agent Agent

Closes out scheduling tasks: picks a contractor approved for the project, sets the deadline inside the project window and leaves the task ready for execution. Posts one entry in the discussion with what it changed.

Pinned skills
Contractor assignmentTask scheduling
Role
Planning
Triggered by
Task assignment
Status
Active
Configure agentAction history
What changes

Progress, without chasing spreadsheets.

From a 2025 site rollout at a telecom operator, where close to 20 teams took part.

Knowing where each site stands

8.5 h10 min

The status updates as the teams report, instead of being assembled from spreadsheets.

Issuing the closeout report

3 daysInstant

It comes out the moment the task closes, with the evidence already validated.

Manual steps to put a site in service

2211

And four of them now run on their own.

Read the full case

Questions we get

What is network rollout management software?

It runs the rollout plan as a process: each project stage opens the work it needs on each site, crews and contractors report from the field, and the stage advances when the work closes, so plan progress is read off the work itself, not off a spreadsheet.

How do I track progress across several contractors?

Every crew and every contractor works in the same queue, each with its own permissions and the form you defined. Closed tasks feed the board, and the average close time per contractor comes out of that same record.

Does it work without signal on site?

Yes. Photos, serial numbers, measurements and signatures are captured offline on the site and sync when the phone gets signal back.

Can AI agents take over part of the process?

Agents are built like any other part of the process: each one carries its role, what triggers it and what it may do. One can pick an approved contractor and set the deadline, and leave the task ready for the team to approve.

Getting started

Bring one process.

One is enough: a site rollout, a commissioning, a corrective. We show it running with your stages and your forms.

You talk to Alfred, our AI assistant, and then to the team.